Discovering the Window Installation Method After Manufacturing

본문
pre-installation phase requires careful planning to ensure a smooth delivery and installation.
Pre-Installation Phase
-------------------

Before the installation team arrives several preparation activities take place at the manufacturing facility. These comprise:
- Visual inspections to ensure the windows are free from defects and potential harm
- Packaging and protective measures to avoid damage during transportation
- Dispatch of installation materials, such as thermal barriers, flashing, and sealants
- Communication with the installation team to schedule the delivery and installation
---------------------------
Upon arrival on-site, the installation team begins by conducting a site survey to assess the installation area. This involves:
- Measuring the opening and verifying it is exact
- Ensuring the surrounding areas are clear of debris and hazards
- Inspecting for any obstacles that may hinder the installation process
- Verifying the type of frame system being used to ensure compatibility
------------------------
Before the new window can be installed, the old window must be taken out. This is usually done by:
- Easing the old window out of the frame using a gentle prying motion
- Disconnecting
- Removing any flashing or sealants around the old window
- Preparation the frame for the new window
---------------------
The installation team then prepares the frame for the new window by:
- Clearing the area to guarantee a even seal
- Installing flashing around the frame to prevent water ingress
- Applying primer or specialized coatings to the frame for protection
- Applying a sealant or weather-tightening system around the frame
---------------------------
The new window is then carefully placed into the prepared frame. This requires:
- Confirming the window is properly aligned with the frame
- Applying shims and wedges to compensate for potential irregularities
- Tapping the window gently into position to secure it
- Tightening all screws or bolts to ensure a firm fit
----------------------------
Once the window is installed, the installation team conducts a series of checks and inspections to guarantee the window is functioning as intended. This includes:
- Checking the window for proper operation and balance
- Inspecting the sealant and flashing for any gaps or signs of compromise
- Inspecting for proper thermal efficiency and performance
- Recording the installation process and keeping a record for РТИ-СЕРВИС future reference